:
Stand the heavy left and right vertical upright posts onto the base frame. Secure them at the bottom using the provided hex bolts and washers. dp dual trac 20 assembly instructions full
The padded components are attached last to give you maximum access to the frame. : Stand the heavy left and right vertical
You will need two adjustable wrenches (or a socket wrench set with 1/2-inch, 9/16-inch, and 3/4-inch sockets), a set of Allen wrenches, a rubber mallet, and a tape measure. You will need two adjustable wrenches (or a
Secure the uprights tightly to the base assembly using the 90mm Carriage Bolts. Step 3: Weight Stack Frame Installation Assemble the (1.2.3). Align the crossbeams with the weight stack frames.
Go back through the entire machine and securely tighten all bolts.
: Secure the left and right upright bases to the long base tube. Use M10 x 90mm bolts and washers as specified. If your model includes a storage tube, attach it to the upright now. Upper Frame & Lat Bar