Analisa Harga Satuan Pekerjaan Furniture Excel -

Dengan analisa ini, Anda tahu persis margin Anda.

| Komponen | Uraian | Koefisien | Satuan | Harga Satuan (Rp) | Total (Rp) | |---|---|---|---|---|---| | | | | | | | | | Kayu Pinus Blockboard | 1.2 | Lembar | 250,000 | 300,000 | | | Cat Duco | 0.8 | Kg | 45,000 | 36,000 | | | Lem Fox | 0.1 | Kg | 25,000 | 2,500 | | | Sekrup & Handle | 1 | Set | 15,000 | 15,000 | | Subtotal Bahan | | | | | 353,500 | | Tenaga Kerja | | | | | | | | Pemotongan & Perakitan | 4 | Jam | 20,000 | 80,000 | | | Finishing | 3 | Jam | 25,000 | 75,000 | | Subtotal Tenaga | | | | | 155,000 | | Peralatan | | | | | | | | Sewa Alat & Listrik | 1 | LS | 25,000 | 25,000 | | Subtotal Peralatan | | | | | 25,000 | | Total Biaya Langsung | | | | | 533,500 | | Overhead & Profit (15%) | | | | | 80,025 | | HARGA SATUAN (HSP) | | | | | 613,525 |

Biaya listrik mesin, sewa workshop, penyusutan alat (mata pisau potong, mesin router , kompresor), dan biaya transportasi pengiriman barang ke lokasi proyek.

Analisa Harga Satuan Pekerjaan (AHSP) furniture adalah perhitungan kebutuhan biaya tenaga kerja, bahan, dan peralatan untuk mendapatkan harga satu jenis pekerjaan furnitur (seperti per meter lari atau per unit) . Di Excel, Anda dapat menyusunnya dengan membagi total biaya dengan kuantitas untuk mendapatkan biaya per unit.

Never forget the "hidden" costs. Add rows for: analisa harga satuan pekerjaan furniture excel

Buat kolom-kolom berikut di Excel:

Pastikan Anda selalu memperbarui database harga material secara berkala mengikuti pergerakan harga distributor di kota Anda agar estimasi tetap akurat.

In your "Component" column, use referring to your Master Data tab. This prevents typos like "Plywood" vs "Ply wood."

| Komponen | Contoh Isi | |----------|------------| | | Pembuatan Lemari Pakaian 1.5m x 2m | | Bahan (Material) | Multiplek 18mm, list plank, handle, cat, lem, paku | | Satuan | Lembar, meter, set, kg | | Koefisien | 2.5 lembar multiplek untuk 1 unit | | Harga Satuan Bahan | Rp 150.000/lembar | | Total Bahan | = koefisien × harga satuan | | Upah Tenaga | Tukang kayu (4 jam), helper (2 jam) | | Harga Satuan Upah | Rp 20.000/jam, Rp 15.000/jam | | Total Upah | (jam tukang × upah) + (jam helper × upah) | | Total Harga Satuan | Total Bahan + Total Upah | Dengan analisa ini, Anda tahu persis margin Anda

Di sheet ini, gunakan rumus =VLOOKUP atau =XLOOKUP untuk mengambil data dari Sheet 1. Keuntungan sistem ini adalah meminimalkan kesalahan input manual.

Format standar AHSP biasanya mencakup kolom: nomor, uraian pekerjaan, kode, satuan, koefisien, harga satuan, dan jumlah harga.

Using Excel for Analisa Harga Satuan Pekerjaan Furniture reduces calculation time from 2–3 hours per item to , while maintaining accuracy within ±3%. The template is fully customizable for workshop scale (small meubel to mid-size kontraktor). Regular updates to Master Data and coefficient validation ensure reliable bids and project profitability.

No, Nama Material/Tenaga Kerja, Satuan (Lembar, Kg, Pcs, Hari), Harga Satuan, dan Keterangan. Sheet 2: Lembar Analisis (AHSP) Di Excel, Anda dapat menyusunnya dengan membagi total

Biaya ini dihitung berdasarkan kapasitas produksi tukang per hari (Oh / Orang-Hari). Dalam workshop furniture, tim kerja biasanya dibagi menjadi:

HPL (High-Pressure Laminate), tacon sheet, vinil, cat duco, melamin, atau pelapis eksterior/interior lainnya.

Untuk membantu Anda memulai, bagaimanakah detail (misal: merek HPL tertentu atau ketebalan kayu) yang biasa Anda gunakan? Saya bisa membantu menyusun pilihan rumus formula Excel yang paling pas untuk kebutuhan produksi Anda.

Vacuum Pump Working Principle: A Simple Breakdown for Beginners
From Science to Systems: How Vacuum Technology Powers Modern Industries

Leave a Reply

Your email address will not be published. Required fields are marked *

My Cart
Close Wishlist
Close Recently Viewed
Categories
analisa harga satuan pekerjaan furniture excel

Product Enquiry