Tgc Bc901h Manual ((top)) ✰ <TOP>
If the water heater has been in standby mode for more than 10 minutes, the priority is automatically released, and the indicator lights will go out. The system will remember the last set temperature when it is used again. Installation and Maintenance
: For energy-efficient drying, run the unit on Ventilation for the first 30 minutes to clear surface moisture, then switch to Dry Cloth mode. 4. 24-Hour Ventilation (Dehumidification)
: If water delivery weakens over time, unscrew the shower head face plate to clear mineral scale blocking the fine spray holes.
The gas water heater main system can link up to two BC-90-1H bathroom remotes and one MC-90-1H kitchen remote simultaneously. tgc bc901h manual
:
: Powers the heating unit down or activates it into a standby state. When switched on, the digital screen, operational indicator, and priority light illuminate simultaneously.
Because modern smart setups feature dual panels (e.g., Kitchen and Bathroom), only one controller can adjust system parameters at any single time. If the water heater has been in standby
2. Understanding and Transferring Control Priority (Priority Button)
Illuminates cleanly whenever the water heater output threshold is manually adjusted to or beyond , reminding the user to mix in cold water before direct contact. 6. Pre-heating Recirculation Toggle (Model Dependent)
The is a highly reliable, temperature-modulated digital bathroom remote control widely used with Towngas premium gas water heaters in Hong Kong . This precise controller lets you adjust water temperatures safely, switch control priorities between the bathroom and kitchen, and monitor performance via digital diagnostics. : : Powers the heating unit down or
This mode extracts stale air, odors, and steam from the bathroom, introducing fresh air circulation. : Press the VENTILATION button.
Inspect the external grille. If internal, contact an authorized technician. 6. Crucial Safety Precautions