Navisworks Manage ^new^ Jun 2026

On screen, the terminal rose from grade beams to steel to decking. At week 14, a red icon appeared at Beam B-407. The duct bent impossibly, then shattered in the simulation. The ceiling fell. The slab above cracked. The eastern façade leaned 0.4 degrees.

If your job description includes running coordination meetings, assigning responsibility for model issues, and tracking clash resolutions, you must use Navisworks Manage . Navisworks File Formats Explained: NWC, NWD, and NWF

What (e.g., structural, MEP, general contracting) are you targeting?

The tool is the backbone of Navisworks Manage. It allows users to run interference checks between different disciplines—such as structural beams clashing with HVAC ductwork—before they become expensive field issues. Navisworks Manage

Imagine a complex hospital project. The structural grid, the HVAC air handling units, the sanitary drainage, the data cable trays, and the medical gas lines are all designed by different teams in different software. Without coordination, these systems will inevitably collide. In the traditional world, these clashes were discovered on-site, leading to expensive rework, RFIs (Requests for Information), schedule delays, and legal disputes.

tool, which distinguishes it from the basic Simulate version. Global eTraining 1. Project Setup & Interface

Navisworks Manage vs. Navisworks Simulate vs. Navisworks Freedom On screen, the terminal rose from grade beams

Which you want to focus on (e.g., Setting up Clash Detective, 4D Scheduling)

Pricing varies by region and currency exchange rates. The AEC Collection is often the most cost-effective option for organizations needing multiple Autodesk products. Organizations should check with authorized Autodesk resellers for current pricing applicable to their region.

You won't be drawing walls or piping here. Instead, you import 3D files from over 60 different formats (like Revit, AutoCAD, and IFC) to see how they interact. The ceiling fell

Autodesk Navisworks Manage is a comprehensive project review software that allows architecture, engineering, and construction (AEC) professionals to holistically review integrated models and data. It serves as a centralized hub where 3D design files from various software platforms can be combined into a single, cohesive project model.

It acts as a single source of truth for multidisciplinary teams, facilitating better communication.

This allows project managers to simulate the construction sequence in a 4D environment.

Navisworks Manage is a comprehensive project review solution used by general contractors, BIM managers, and design engineers. It allows users to aggregate 3D models from various software applications into one centralized file.